Penanganan Kolam Sedimentasi Hasil Pencucian Bauksit Di PT. ANTAM Tbk. Tayan

Muhammad Ridho, Peter Eka Rosadi

Abstract


Bauxite ore mining PT.Antam Tbk. located in Tayan Hilir Subdistrict, Sanggau Regency, West Kalimantan Province is an open pit backfilling system. Besides the bauxite ore extraction, the washing process resulted slurry which is entering the open channel towards the sedimentation pond. This study aims to determine the total discharge of slurry that will enter the sedimentation pond and assess the capacity of existing sedimentation ponds. The results showed that based on the production target of 700,000 tons of Bauxite Washed/year with 60% concretion factor data, the total discharge of water entering the sedimentation pond was 3.54 m3/sec. The slurry from the open channel will go into the sedimentation pond so that the deposition found in Segment I, IV, V, and VI was 409.06 m3/day, 254.59 m3/day, 561.35 m3/day, and 273.90 m3/day respectivelly. Intensive dredging material will be carried out using two Hitachi Zaxis 210 LC Long-Arm Excavator units. The cleaning time needed by Segment I, IV, V, and VI are 10 days, 6 days,  9 days and 5 days, so that the dredging time of Segment I, IV, V, and VI are 82 days, 65 days, 53 days and 62 days respectivelly


Keywords


open channel; rainfall; sediment pond

Full Text:

PDF

References


Asdak, C. 2010. Hidrologi dan Pengelolaan Daerah Aliran Sungai. Yogyakarta: Gadjah Mada University Press.

Aurecon. 2011. Draft Drainage Strategy, Part Lot 9765. Prepared for CICAustralia Palmerston.

Brisbane City Council.2001. Sediment Basin Design, Construction and Maintananece Guidelines. Brisbane City Council, Brisbane.

Budiarto, Hartono, dan Hasywir Thaib Siri. 2015. Tambang Terbuka. Yogyakarta: Program Studi Teknik Pertambangan UPN “Veteran”.

Depeweg, H., Paudel, Krishna, Mendez, N. 2014. Sediment Transport in Irrigation Canals.CRC Press.

Fifield, J.S. 2001.Designing for Effective Sediment and Erosion Control on Construction Sites. Forester Communications, California.

Huisman, L. 1978.Sedimentation and Flotation, Mechanical Filtration. Netherlands: Delft University of Technology. p.1-14.

Petr Hlavinek, Igor Winkler, Jiri Marsalek. 2010. A road to Safer Society and Environment. Ukraine:Springer. p.288

PT. Antam (Persero), Tbk UBPB Tayan. (2016). Laporan Kegiatan PemantauanSediment Pond.Kalimantan Barat, Indonesia: PT. Antam (Persero), Tbk UBPB Tayan.

Sulistyana B., Dr. Ir. Waterman, MT,.2010. Perencanaan Tambang. Universitas PembangunanNasional “Veteran“ Yogyakarta.




DOI: https://doi.org/10.31315/jmel.v2i2.2157

DOI (PDF): https://doi.org/10.31315/jmel.v2i2.2157.g2241

Refbacks

  • There are currently no refbacks.




This Journal indexed to :

 

Crossref Content Registration JMEL on GS    

 

====================================================

Jurnal Mineral, Energi, dan Lingkungan

Published By: Universitas Pembangunan Nasional Veteran Yogyakarta

Addres: Jl. Padjajaran Jl. Ring Road Utara No.104, Ngropoh, Condongcatur, Sleman, Yogyakarta

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License. Statistik Jurnal Statistik Jurnal

slot gacor slot gacor hari ini slot gacor 2025 demo slot pg slot gacor slot gacor