Proposed Machine Maintenance Management To Reduce Breakdown In Kacang Atom Production Process PT. XYZ With Preventive Maintenance Method

Yusril Ananda Ainun Huda, Pramudi Arsiwi

Abstract


PT. XYZ is engaged in the production of snacks. This company makes products from raw materials to finished products. In the packaging section using a machine called CingFong, the problem that often occurs in the packaging section is that there is often a buildup of production materials due to waiting for machines that have not finished maintenance so that it can reduce the productivity of this factory. Overall the method used is Preventive Maintenance by looking for Mean Time To Failure (MTTF) to identify critical components in Cingfong engine parts. From the data processing that has been done, it is known that the Clutch, Blade and Emergency Stop are components that fall into the category of critical components with a total Cumulative Downtime of 70.3%.


Keywords


Preventive Maintenance, Mean Time To Failure

References


Angius, A., Colledani, M., Silipo, L., & Yemane, A. (2016). Impact of Preventive Maintenance on the Service Level of Multi-stage Manufacturing Systems with Degrading Machines. IFAC-PapersOnLine, 49(12), 568–573. https://doi.org/10.1016/j.ifacol.2016.07.696

Basri, E. I., Razak, I. H. A., Ab-Samat, H., & Kamaruddin, S. (2017). Preventive maintenance (PM) planning: A review. Journal of Quality in Maintenance Engineering, 23(2), 114–143. https://doi.org/10.1108/JQME-04-2016-0014

Budiartami, N. K., & Wijaya, I. W. K. (2019). Analisis Pengendalian Proses Produksi Untuk Meningkatkan Kualitas Produk Pada CV. Cok Konveksi di Denpasar. Jurnal Manajemen Dan Bisnis Equilibrium, 5(2), 161–166. https://doi.org/10.47329/jurnal_mbe.v5i2.340

Cai, J., Yin, Y., Zhang, L., & Chen, X. (2017). Joint optimization of preventive maintenance and spare parts inventory with appointment policy. Mathematical Problems in Engineering, 2017. https://doi.org/10.1155/2017/3493687

Karima, H. Q., & Romadlon, F. (2021). Optimizing the Preventive Maintenance Scheduling Based on Dynamic Deterministic Demand in The Cement Manufacturing. Jurnal Ilmiah Teknik Industri, 20(1), 109–118. https://doi.org/10.23917/jiti.v20i1.13894

Kikolski, M., & Ko, C. H. (2018). Facility layout design - Review of current research directions. In Engineering Management in Production and Services (Vol. 10, Issue 3, pp. 70–79). https://doi.org/10.2478/emj-2018-0018

Kovács, G. (2018). Methods for Efficiency Improvement of Production and Logistic Processes. Research Papers Faculty of Materials Science and Technology Slovak University of Technology, 26(42), 55–61. https://doi.org/10.2478/rput-2018-0006

Lazim, H. M., Taib, C. A., Lamsali, H., Saleh, M. N., & Subramaniam, C. (2016). The impact of preventive maintenance practices on manufacturing performance: A proposed model for SMEs in Malaysia. AIP Conference Proceedings, 1761. https://doi.org/10.1063/1.4960899

Li, R., & Zhang, X. (2020). Preventive Maintenance Interval Optimization for Continuous Multistate Systems. Mathematical Problems in Engineering, 2020. https://doi.org/10.1155/2020/2942940

Niu, D., Guo, L., Bi, X., & Wen, D. (2021). Preventive maintenance period decision for elevator parts based on multi-objective optimization method. Journal of Building Engineering, 44(July), 102984. https://doi.org/10.1016/j.jobe.2021.102984

Parvez, M., Amin, F., & Akter, F. (2017). Line Balancing Techniques To Improve Productivity Using Work Sharing Method. IOSR Journal of Research & Method in Education (IOSRJRME), 07(03), 07–14. https://doi.org/10.9790/7388-0703040714

Pereira, A. M. H., Silva, M. R., Domingues, M. A. G., & Sá, J. C. (2019). Lean six sigma approach to improve the production process in the mould industry: A case study. Quality Innovation Prosperity, 23(3), 103–121. https://doi.org/10.12776/QIP.V23I3.1334

Qu, L., Liao, J., Gao, K., & Yang, L. (2022). Joint Optimization of Production Lot Sizing and Preventive Maintenance Threshold Based on Nonlinear Degradation. Applied Sciences (Switzerland), 12(17). https://doi.org/10.3390/app12178638

Siswanto, A., & Kurniati, N. (2018). Determining optimal preventive maintenance interval for component of Well Barrier Element in an Oil & Gas Company. IOP Conference Series: Materials Science and Engineering, 337(1). https://doi.org/10.1088/1757-899X/337/1/012066

T, D. M., & Yogish, H. (2018). Preventive Maintenance and Root Cause Analysis of Sealed Quench Furnace in Axle Heat Treatment Line. 900–904.

Taifa, I. W. R., & Vhora, T. N. (2019). Cycle time reduction for productivity improvement in the manufacturing industry. Journal of Industrial Engineering and Management Studies, 6(2), 147–164. https://doi.org/10.22116/JIEMS.2019.93495




DOI: https://doi.org/10.31315/opsi.v15i2.8046

Refbacks

  • There are currently no refbacks.




Sekretariat :
Jurusan Teknik Industri
FTI UPN "Veteran" Yogyakarta
d.a Jalan Babarsari 2 Tambakbayan Yogyakarta 55281
Telp. (0274) 486256
Website http://jurnal.upnyk.ac.id/index.php/opsi
email : jurnal.opsi@upnyk.ac.id

 

indexed by:

 
 
 


Lisensi Creative Commons
This work is Licensed Under a Creative Commons Attribution 4.0 International license.

View My Stats